The Blue Water Pools and Renovations Construction Process

Building an in-ground swimming pool requires a significant amount of trust in your swimming pool builder and landscape architect. At Blue Water Pools and Renovations, our construction process is structured and practiced, and our crews work efficiently and thoroughly through each step. A seasoned Project Manager will oversee your project from start to finish and guide you through construction to ensure that your pool is delivered on-time and on-budget.

Phase 1: Design & Drafting
The Blue Water Pools and Renovations Construction Services team begins working on your project as soon as the design is approved. The first step is to convert the design plans into working computer-aided drawings (CAD). During this step, our Drafting team will consult with engineers and landscape architects as necessary to prepare all documents needed to secure a town building permit.


Phase 2: Permitting
Upon completion of working construction drawings, Blue Water Pools and Renovations will submit all required paperwork to your town building department. Depending on the town, scope of project and time of year, the permit review process can take anywhere from several weeks to several months. Blue Water Pools and Renovations will remain actively involved throughout the duration in order to secure the necessary building permit.


Phase 3: Project Kick-off
Once a building permit is issued by your town, it’s go-time! A Project Manager and Field Supervisor will be assigned to your project and will work with you to schedule a project kick-off meeting. Blue Water Pools and Renovations kick-off meetings are held at the pool site and are led by the Project Manager and Field Supervisor. The purpose is to review every construction detail to ensure that all parties are on the same page and that the proper material orders can be placed. A project timeline will be presented at the kick-off meeting and potential challenges and/or unknowns will be discussed.


Phase 4: Site Preparation
Blue Water Pools and Renovations will properly prepare your property to accommodate the project specifications. This includes creating an access road to accommodate large vehicles and machinery, erecting temporary safety fencing, clearing the pool site of trees, bushes or other obstacles, and putting up protective barriers for existing structures as necessary.


Phase 5: Forming & Excavation
To form the pool, Blue Water Pools and Renovations crews will stake and rope the exact dimensions of the future swimming pool to guide excavation. At this point you will be able to get a true picture of the size and location of your swimming pool. Next, the excavation team will begin digging within the borders of formed pool outline. When excavation is complete, you will have an open pit roughly the size and shape of your swimming pool.


Phase 6: Plumbing & Electrical
Plumbing and electrical trades are brought in early in the construction process to run all piping and wires and/or sleeves before concrete is poured for the shell of the swimming pool.


Phase 7: Steel Reinforcement (Rebar) & Shotcrete
Once the plumbing and electrical lines are run, the Blue Water Pools and Renovations crew will begin preparing the pool for concrete (also referred to as Shotcrete). Rebar is used to frame the walls, steps and other interior structural elements of the swimming pool. The Shotcrete team will then install the interior concrete shell of the swimming pool.


Phase 8: Tile & Coping
Tile and coping installation are the next processes to be completed. Blue Water Pools and Renovations’s expert masons will first set the tile band around the interior perimeter of the pool. Next, they will lay coping around the top perimeter of the pool. Coping is the stone border that creates the frame or “edge” of the pool. Typically, coping is made of the same stone as the pool deck, but it's cut into long rectangular pieces ranging in width from 12” to 24”.


Phase 9: Masonry
With the shell, tile and coping complete, experienced masons begin stonework for the full outdoor living project. This includes decks, patios or raised terraces, structural features such as retaining walls, walkways and steps as well as entertainment features such as fire pits and outdoor kitchens.


Phase 10: Drainage
When an impermeable structure is built on any property, it must be established whether rainwater will have a negative impact on neighboring properties. If an engineer determines that will be the case, a drainage system must be designed and implemented. Plans for the drainage system will be submitted to the town during the permitting process and installed at this phase prior to the application of the pools’ interior finish.


Phase 11: Interior Finish
The interior finish is one of the final steps of swimming pool construction and will provide the wearable surface of the pool. The most common finishes are standard plaster (or marcite) and exposed aggregate such as quartz or pebble. The pool is filled with water shortly the interior finish is applied, and a code compliant fence will need to be complete at this time.


Phase 12: Project Closeout
Once pool construction is finished, the pool permit can be closed.



Testimonials

Using Blue Water Pools and Renovations means craftsmanship, attention to detail, respect to scheduling, eff...

Continue Reading


Many thanks. Blue Water Pools and Renovations was a wonderful experience. (We) are so impressed with the qu...

Continue Reading


The pool looks beautiful and the children had their first swim yesterday at night. So, thank you for the gr...

Continue Reading


Blue Water Pools and Renovations

PO Box 31381
Charleston, SC 29417

Direct: (843) 259-6949

Email


Share